Raised sidewalk panel creating a trip hazard in a Summerlin HOA community

Trip Hazard • Summerlin • 62 locations

HOA Sidewalk Trip Hazard Grinding — Summerlin

Community-wide walkthrough, hazard log, and batch grinding of 62 offsets across a mature Summerlin association — no excavation, no replacement panels.

Service
Trip Hazard
Size
62 locations
Area
Summerlin
Scope
Prep only — no coatings sold

The problem

Mature landscaping and root heave had lifted sidewalk panels across the association's interior walkways, mail stations, and pool deck approach. The board had a replacement bid in hand that covered a fraction of the locations at several times the cost, and residents were reporting stumbles at the darker segments of the loop path.

Scope of work

  • Full property walkthrough with the community manager: every offset measured, marked, and numbered
  • Hazard log delivered to the board with counts by location and severity
  • Batch grinding of 62 offsets across walkways, mail stations, and the pool deck approach
  • Tapered transitions ground rather than sharp steps, with edges feathered into the surrounding slab
  • Textured, non-slick finish left on all exterior surfaces
  • Before and after photos per numbered location for the association's records
  • Four panels flagged as structurally failed and recommended for replacement instead of grinding

Equipment used

  • Walk-behind trip hazard grinder with dust shroud
  • Shrouded 7" hand grinders for tight radius and edge blending
  • HEPA-filtered vacuum extraction on all units
  • Digital level and offset gauges for pre- and post-measurement

The result

Sixty-two hazards reduced in two scheduled days at a fraction of the replacement bid, with walkways usable immediately after each pass. No landscaping or irrigation disturbed. The board received a documented log per location for insurance and reserve records, plus an honest short list of the panels that genuinely needed replacement.

Job site gallery

Offset sidewalk panels before trip hazard grindingShrouded grinder cutting a raised sidewalk edge flatGround and blended sidewalk transition after trip hazard workPool deck approach walkway after trip hazard grinding

Before / after

Same sidewalk section ground to a smooth tapered transition
Raised concrete sidewalk lip before grinding
BeforeAfter
Drag the slider to compare the slab before and after prep.

More work

Other recent projects

  • Thinset Removal

    1,200 Sq Ft Thinset Removal — Las Vegas

    View project
  • Grinding

    5,000 Sq Ft Coating Removal — Henderson Warehouse

    View project
  • Epoxy Prep

    Garage Epoxy Prep — North Las Vegas

    View project
All projects

Similar job?

Get a scoped bid on your slab

Send square footage, what's coming off the floor, and your install date — contractors can request trade pricing on the contractor page.